UL / Trade Detail |
Description |
F-Rating |
Product(s) |
CEJ127P_110610.pdf |
Glass Spandrel Panel with Aluminum Framing (Max JW = 6") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ216P_021312.pdf |
Glass Spandrel Panel and Aluminum Framing (Max. JW=6") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ244P_021312.pdf |
Concrete Panels with Steel Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ245P_021312.pdf |
Concrete Panels with Steel Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ246P_031711.pdf |
Glass Spandrel Panel and Aluminum Framing |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ259P_021312.pdf |
Gypsum with EIFS Finish and Steel Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ260P_112010.pdf |
Gypsum with Stucco Finish and Steel Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ261P_112010.pdf |
Gypsum with Stone Finish and Steel Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ262P_112010.pdf |
Gypsum with Brick Finish and Steel Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ263P_112010.pdf |
Gypsum with Aluminum or Steel Siding and Steel Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ264P_112010.pdf |
Gypsum with EIFS Finish and Steel Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ265P_112010.pdf |
Gypsum with Aluminum or Steel Siding and Steel Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ307P_110610.pdf |
Glass or Aluminum Spandrel with Aluminum Framing (Max. JW=8") |
3-hour |
CP 672 FC
CFS-SP WB
|
CEJ308P_110610.pdf |
Glass Spandrel with I-shaped Aluminum Framing (Max. JW=8") |
3-hour |
CP 672 FC
CFS-SP WB
|
CEJ309P_102910.pdf |
Glass Spandrel with Aluminum Framing (Max. JW=8") |
1-3/4Hr |
CP 672 FC
CFS-SP WB
|
CEJ310P_102910.pdf |
Glass Spandrel with Aluminum Framing (I-shaped) (Max. JW=8") |
1-3/4 hour |
CP 672 FC
CFS-SP WB
|
CEJ314P_110610.pdf |
Gypsum with Brick Finish and Steel Framing (Max. JW=6") |
2-3/4 hour |
CP 672 FC
CFS-SP WB
|
CEJ 315P.pdf |
Gypsum with Cementitious Finish and Steel Framing (Max. JW=6") |
2-3/4 hour |
CP 672 FC
CFS-SP WB
|
CEJ316P_110610.pdf |
Gypsum with Plaster Finish and Steel Framing (Max. JW=6") |
2-3/4 hour |
CP 672 FC
CFS-SP WB
|
CEJ400P_110510.pdf |
GFRC Panels with steel framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ421P_110510.pdf |
Gypsum wall with various facades (Max. JW=9", including studs) |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ425P_110510.pdf |
Gypsum wall with various facades. Steel framing starts and stops above and below floor (Max. JW=0") |
2-hour |
CP 672 FC
CFS-SP WB
|
CEJ526P_110510.pdf |
Glass Spandrel with Aluminum Framing (vision glass at floor) (Max. JW=6") |
1-hour |
CP 672 FC
CFS-SP WB
|
CEJ529P_110610.pdf |
Glass spandrel panel with aluminum framing (Max. JW=2") (25% vertical shear movement) |
2-hour |
CP 672 FC
CFS-SP WB
|
CWD1001_060410.pdf |
Tilt-up Concrete Panel Curtain Wall (Max. JW=6") |
2-hour |
CP 672 FC
CFS-SP WB
|
CWD1003_011314.pdf |
Tilt-up Concrete Panel Curtain Wall (Max. JW=6") |
2-hour |
CP 604
CFS-SILSL
|
CWD1015_050813.pdf |
Glass, Aluminum, or Granite Spandrel with Aluminum Framing (Max. JW=4") |
2 Hour |
CP 672 FC
CFS-SP WB
|
CWD1018_052413.pdf |
Tilt-up Concrete Panel Curtain Wall (Max. JW=3") |
3 Hour |
CP 672 FC
CFS-SP WB
|
CWD2025_011113.pdf |
Insulated Tilt-up Concrete Panel Curtain Wall (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CWD2026_011314.pdf |
Glass, Aluminum, or Granite Spandrel with Aluminum Framing (Max. JW=8") |
2-hour |
CP 604
CFS-SILSL
|
CWD2027_011113.pdf |
Glass, Aluminum, or Granite Spandrel with Aluminum Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CWD2046_011014.pdf |
Glass, Aluminum, or Granite Spandrel with Aluminum Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CWS1007_060410.pdf |
Tilt-Up Concrete Panel Curtain Wall (Max JW = 6") |
2-hour |
CP 672 FC
CFS-SP WB
|
CWS2027_011314.pdf |
Glass Spandrel Panel and Aluminum Framing (Max. JW=8") |
2-hour |
CP 604
CFS-SILSL
|
CWS2028_011113.pdf |
Glass Spandrel Panel and Aluminum Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CWS2029_011314.pdf |
Aluminum Spandrel Panel and Aluminum Framing (Max. JW=8") |
2-hour |
CP 604
CFS-SILSL
|
CWS2030_011113.pdf |
Aluminum Spandrel Panel and Aluminum Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CWS2031_011113.pdf |
Granite Spandrel Panel and Aluminum Framing (Max. JW=8") |
2-hour |
CP 604
CFS-SILSL
|
CWS2032_011113.pdf |
Granite Spandrel Panel and Aluminum Framing (Max. JW=8") |
2-hour |
CP 672 FC
CFS-SP WB
|
CWS2053_011113.pdf |
Insulated Tilt-up Panel Curtain Wall (Max. JW=6") |
2-hour |
CP 672 FC
CFS-SP WB
|
HI-BP 120-05_112010.pdf |
Gypsum with various facades. Steel framing starts and stops above and below floor (Max. JW=0") |
2-hour |
CP 672 FC
CFS-SP WB
|
HI-BP 150-01_071312.pdf |
Glass spandrel with aluminum framing (vision glass at floor) (Max. JW=8") |
2-1/2 hour |
CFS-SP WB
|